You are here: Home / Ongoing Projects
- Protection of Ramgoti and Komolnogor from the Erosion of Padma
- Slope Protection and River Bank Protective Work at Tajumuddin Upazilla sadar
- Protection of Ramneoaz Launchghat area of Monpura Upazila and Gosherhat Launchghat area of Charfession Upazila
- Construction of 4-Lane with Hard Shoulder of Feni-Noakhali National Highway
- Construction of 4-Lane with SMV Lane of Feni-Noakhali National Highway
- Output & Performance-Based contract for Improvement & navigability from Mongla to Pakshi river
- Dredging work of Panchagarh-Dinajpur-Naogaon-Pabna river route.
- Embankment Construction and Earth Protection Works at Paira, Patuakhali.
- Bakkhali River Flood Control, Drainage, Irrigation & Dredging Project (1st Phase)
- Land Development works of Gazaria 350 MW Coal Fired Thermal Power Plant.
- Purbachal New Town project (Gazipur Part).
- Protection of different infrastructures from the right bank errosion of Jamuna River at Gaibandha Sadar & Fulchari Upazilla.
- Flood Control and Drainage Improvement project at Noakhali.
- Drainage improvement of Dhaka Narayangonj Demra (DND) project (phase II)
- Protection of Ramgati and Komol nagar Upazilla and adjacent area under Lakshmipur district.
- Construction of Sheikh Hasina Textile College, Melandah, Jamalpur.
- Land development at BSCIC industrial park, Sirajganj.
- Construction of Sheikh Hasina Specialized Jute Textile Mill at Madarganj, Jamalpur.
- Supply & Installation of 35,000 Nos Pre-Payment Meter with Accessories at Gazipur, Savar, Mymensingh & Narsingdi.
- Construction of Embankment at North Side Boundary of Kohelia Power Plant Project (ID-252391).
- Land Development for Construction of Temporary Site Office and Temporary Police/ Ansar Barrack of Kohelia Power Plant Project (ID-252891).
- Land Development by Sand/Earth Filling at Township Area of Matarbari 2×600 MW Ultra Super Critical Coal Fired Power Plant Project (ID-257135).
- Performance Based Dredging Contract for Improvement of navigability of old Brahmaputra River Lot-03: CH 20.00 Km to 31.00 Km.
- Construction of 1×104 Married OR’s Qtr (14 storey with 14 storied foundation 08 unit each floor, other facilities in ground floor) including ancillary works for Sta HQ at Bir Uttam Shahed Mahbub Cantt (1st Phase).
Scroll to top