Bakkhali River Flood Control, Drainage, Irrigation & Dredging Project (1st Phase)

Construction of Embankment (38.000 km.), River Dredging (28.500 Km.), Bank Protective Work (1.800km.), Canel Re-Excavation (7.500 Km.), Construction of Regulator (1-vent, 5 Nos) in Connection  with  “Bakkhali River Flood Control, Drainage, Irrigation & Dredging Project (1st Phase)’’ at Upazila- Cox’s Bazar Sadar & Ramu, District-Cox’s Bazar under Cox’s Bazar O&M Division, BWDB, Cox’s Bazar during the year 2017-18 & 2018-19 (Tender No. DPM 01/Bakkhali/2017-18, Package No. DPM 01/Bakkhali)

Main Procurement Entity Bangladesh Water Development Board
Work Order/ NOA No. NOA No-W-1/3890, Date: 18 October 2017.
Commencement Date 01 Nov 17
Completion Date 30 Jun 2019